Skip to content
BOS-Elektromatik-Key-Visual-2026-Web

Energy Week 2027

Vaasa City Hall, Finland
17–18 March 2027

Energy storage and data center backup power

Meet our specialists in Vaasa to discuss your next project.

Meet BOS Power at Energy Week 2027

Bring your project requirements and technical questions to our team:

  • Utility-scale BESS design, grid integration and compliance
  • Data center backup power and redundancy
  • Commissioning, maintenance and lifecycle support

Venue: Vaasa City Hall, Senaatinkatu 1, 65100 Vaasa, Finland.

EnergyWeek runs from 15–18 March 2027. Meet BOS Power on 17–18 March.

Battery energy storage systems (BESS)

Planning a utility-scale BESS project?

Developing a grid-connected battery storage project in the Nordics? Bring your project scope, grid requirements and integration challenges to our BESS specialists at Energy Week.

BOS Power is an EPC partner and system integrator for MW-scale BESS projects, bringing engineering, supplier qualification, system integration, commissioning and grid approval into one coordinated delivery.

  • System sizing, battery, PCS and control interfaces
  • Grid code compliance, testing and approval
  • Commissioning and long-term lifecycle support
BOS-P_Battery-container_v1-1
Emergency power (EMP)

Planning reliable backup power for your data center?

Data center backup power systems must meet demanding requirements for availability, redundancy and reliable operation.

Meet our specialists at Energy Week 2027 to discuss generator set selection, system integration, commissioning and lifecycle support.

Whether you are planning a new data center or expanding existing capacity, BOS Power can help you evaluate the technical requirements for your emergency power installation.

  • How should backup power capacity and redundancy be planned?
  • What should be considered when integrating generator sets and UPS systems?
  • How can maintenance and lifecycle support contribute to long-term reliability?
17–18 March 2027

Meet the BOS Power team at Energy Week 2027

Arrange a meeting at Vaasa City Hall on 17–18 March 2027. Contact one of our specialists below with a short description of your project and your preferred meeting time.

TOUCH
Tommi Järviharju Senior Sales Manager Energy Storage

Energy Storage |

t. +358 40 676 1606

Tommi Järviharju Senior Sales Manager Energy Storage
TOUCH
Jussi Mäkinen Sales Director Data Center, International

Sales | Power Generation

t. +358 406 208 918

Jussi Mäkinen Sales Director Data Center, International
TOUCH
Patrik Dahl Solution Manager ESS

t. +358 400 666 357

Patrik Dahl Solution Manager ESS
TOUCH
Kim Strate Kiegstad Head of Energy Storage

Fast charging station | Energy Storage

t. +45 53 60 13 30

Kim Strate Kiegstad Head of Energy Storage