Reliable backup power for resilient data center operations
Scalable backup power for a growing data center
EcoDataCenter needed a reliable power partner capable of supporting continuous data center operations while adapting to changing capacity requirements and future expansion.
BOS Power, together with Elektromatik and Rolls-Royce Power Systems, delivers and continues to support scalable backup power systems designed around redundancy, reliability, and long-term operational needs.
- Project. EcoDataCenter
- Application: Data center operations
- Solution: Emergency and backup power systems
- Key requirements: 24/7 uptime, redundancy, scalability, and reliable system response
- BOS Power role: Power system delivery, integration, project execution, and lifecycle support
- Partners: Elektromatik and Rolls-Royce Power Systems
Introduction
EcoDataCenter is a Swedish data center company founded in 2014, providing sustainable and secure data center solutions in the Nordic region.
With a focus on energy efficiency and sustainability, EcoDataCenter needed a reliable partner to support its critical data center infrastructure and long-term capacity requirements.

Requirements for an emergency power partner
When EcoDataCenter started their search for a supplier of an emergency power solution in 2016, they were looking for more than just a supplier of products and services.
They were seeking a true partnership that would challenge them, inspire improvement, and provide the necessary support for their operations.
Key traits they sought in a partner included reliability, local presence, system integration capabilities, high-quality products, and efficiency.
An important requirement was a partner that could respond flexibly to EcoDataCenter's needs while also challenging technical decisions when appropriate.
Building A Resilient Data Center Infrastructure
EcoDataCenter required an emergency power system that could support continuous data center operations while meeting demanding requirements for reliability, availability and scalability. The company also needed access to technical expertise and integrated project delivery.
The expansion plans for their Falun data center, EcoDataCenter 1 presented an opportunity to find such a partner who could offer an emergency power solution that not only met their immediate requirements but also provided scalability, flexibility, and capacity for future expansion.
Key requirements for the project:
- Continuous uptime. Data center operations cannot tolerate unexpected power interruptions.
- Redundancy. The power architecture must provide reliable backup capacity when individual components or systems are unavailable.
- Scalability. Capacity requirements change as the data center expands and customer demand increases.
- Long-term reliability. Power systems must remain maintainable, serviceable, and dependable throughout their operating life.

EcoDataCenter. A large-scale data center site for HPC, Colocation and Wholesale in Falun, Sweden.
Solution Design And Collaboration
EcoDataCenter collaborated closely with Elektromatik (part of BOS Power) and Rolls Royce Power Systems (RRPS) to design a customised emergency power solution that aligned with their specific needs and vision.
The collaboration combined expertise in emergency power, system integration and project execution to develop a solution around EcoDataCenter's operational requirements.
A key aspect of the solution was the implementation of a distributed redundant topology, designed to deliver reliable power to EcoDataCenter’s customers. Elektromatik and RRPS provided end-to-end responsibility, and integrated project management and high-quality products for the entire emergency power solution.
The integrated delivery simplified project execution and enabled the system components to be installed within the data center building, eliminating the need for external containers and pipes.


Diesel Generator Sets
Mission-critical backup power for data centers
BOS Power provides integrated diesel generator solutions designed for demanding applications where uptime is non-negotiable. From system design and integration to commissioning and lifecycle support, the solution can be tailored to your site's capacity, redundancy, and operational requirements.
Advantages & Benefits
From a design perspective, the solution catered to EcoDataCenter’s preferences, with all components installed inside the building, thereby maintaining a clean and aesthetically pleasing facility.
In terms of technical requirements, the Emergency Power Solution was designed to deliver the required power within a specified timeframe in the event of a grid failure. This met EcoDataCenter’s uptime requirements, ensuring uninterrupted operations for their customers.
The solution’s scalability and flexibility allow for future growth and expansion, accommodating changing needs and demands. By adopting a building block approach, EcoDataCenter can easily adjust the size and capacity of their infrastructure as their business evolves, optimizing efficiency and cost-effectiveness.
Sustainability forms the fundamental focus of both parties involved in this collaboration. The implemented solution has paved the way for the potential to utilize advancements in sustainable practices, such as the use of fossil-free diesel alternatives such as HVO (hydrotreated vegetable oil).
Additionally, the heat generated by the emergency power solution can potentially be harnessed and repurposed, contributing to the overall energy efficiency of the data center.

Key benefits include:
-
Reliable 24/7 operations: Backup power infrastructure helps protect critical data center operations against grid disturbances and outages.
-
Scalable capacity: The solution can be adapted as EcoDataCenter's infrastructure and power requirements develop.
-
Redundancy and resilience: Multiple systems and backup capacity reduce operational risk and support continuity.
-
Long-term partnership: Ongoing collaboration gives EcoDataCenter access to technical expertise, maintenance, and system support as requirements change.
-
Operational efficiency: Planning, service, and system design help reduce unnecessary operational risk over the lifetime of the installation.
Collaborative Partnership
TThe collaboration between EcoDataCenter, Elektromatik and RRPS is built around ongoing technical dialogue, project planning and coordination. This enables the partners to plan capacity and system requirements together as EcoDataCenter's infrastructure develops.
A time-to-market (TTM) approach supports coordinated project execution, agreed delivery schedules and efficient resource planning.
By looking ahead and planning for future growth, the partnership ensures timely delivery of required solutions and the ability to respond effectively to unforeseen risks.

Testimonial
EcoDataCenter on the long-term collaboration:Attests to the value of the partnership:
“This is what we have found with the current collaboration with Elektromatik and RRPS. We carry out monthly tests and biannual black building tests. We are never worried when we flip the switch. That is because of the people from Elektromatik and RRPS. They are reliable and competent.”
“By investing competence from our side, and EcoDataCenter investing from their side, we end up in a win-win situation. This commitment and sharing of specialization and experience creates both succesful projects and effective solutions.”
“RRPS is providing the backup system for EcoDataCenter’s data center operations. Data availability, 24/7 and in every second, is the key element of a data center’s business model and the backup system ensures that this operation will continue without any issues, whatever happens. It is, so to say, the insurance policy for the business model.
The backup power systems are proven technology with thousands of installed units worldwide. RRPS stands out for its market-leading reliability and lowest possible emissions.”
Robust Support System for Data Center Operations
The first two deliveries included:
FIRST DELIVERY
- Project management, installation, commissioning
- 6 mtu generator sets: 4x1,65MW DCP and 2x1,35MW DCP
- Control system
- Exhaust system
- Cooling system
- Fuel system
SECOND DELIVERY
- Project management, installation, and commissioning
- 8 mtu generator sets: 8x2,26MW DCP
- Control system
- Exhaust system
- Cooling system
- Fuel system

Frequently asked questions
Data centers depend on continuous power to maintain critical digital infrastructure. Redundant backup systems help reduce the risk that a single failure causes operational downtime.
BOS Power and its partners delivered backup power systems, integration, project management and supporting infrastructure designed around EcoDataCenter's operational requirements.
A scalable power architecture makes it possible to adapt backup capacity as infrastructure, customer demand and power requirements increase.
BOS Power contributed system expertise, project execution and coordination together with Elektromatik and Rolls-Royce Power Systems.
Reliable backup power depends on system design, regular service, maintenance and access to technical expertise throughout the installation's operating life.
Talk to an emergency power expert
Planning new capacity, replacing existing backup systems, or reviewing redundancy in your data center?
Our specialists can help you assess power requirements, system architecture, redundancy, scalability, and lifecycle support.
Want to save the case study or share it with a colleague?
Proven in Mission-Critical Environments
Our emergency power systems support critical facilities across the Nordics.
Reliable emergency power is critical when research, healthcare, and education depend on uninterrupted operations. In this case study, BOS Power shows how a DRUPS-based solution helps secure stable, battery-free power for the Life Science Building in Oslo, one of Norway’s most advanced research facilities.
Read the full case study →
Read the case study
EcoDataCenter partnered with BOS Power to replace fossil diesel with HVO100 for backup power—reducing emissions while maintaining the reliability critical to data center operations.
Read the full case study →
Read the case study
To secure district heating under strict downtime requirements, BOS Power delivered a hybrid solution combining mtu emergency power and mtu energy storage for DIN Forsyning. The system supports reliable backup operations while enabling a smoother transition toward greener energy and future-ready flexibility.
Read the full case study →